From: route@monster.com
Sent: Tuesday, August 23, 2016 12:35 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: osp engineer
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Jerardo Echeverria 1420 W Main St. Apt 505 Lewisville, Texas, 75067 (972) 998-0158 Objective: To obtain a position as
an OSP Designer Education: ITT-Technical Institute, Austin, TXGraduation date Dec. 2007 Associate of Science in Computer Drafting and Design ·
3.6GPA
·
CAD
Club Skills: ·
Microstation
/ BentleyCOMMS(V8.05 & V8i) ·
Salesforce ·
CSG ·
Granite ·
AutoCAD
2014 ·
AutoCAD
Revit ·
Google
Earth ·
MapZilla ·
ArcGIS ·
Map
Info ·
Microsoft
Office Suite ·
Nitro
Pro ·
Detail
oriented ·
Ability
to work independently and under pressure. ·
Ability
to work as a team member and follow directions. ·
Able
to create accurate, clear plans and detailed drawings that are based on
information provided by engineers and customers. ·
Fluent
in Spanish Work History: Time Warner Cable, Coppell, TXJune 2013 – Present Designer 3 ·
Fiber
& coax design support for PacWest. ·
V8i
and V8.05 fiber design module experience. ·
Training
in fiber design deliverables for PacWest. ·
Assist
with Bentley Comms V8.05 & V8i staff training in both usage & design
philosophy. ·
Design
mentor for plant extensions & redesigns in both V8.05 & V8i. ·
Completed
preliminary node split proposals & node split final designs for PacWest
and Mtn. West areas. ·
Prepared
and presented PacWest Node Split design “How to” document for team and shared
resource designers. ·
Completed
plant extensions & redesigns in 2014. ·
Coordinate
& track tap cut line of business for all of PacWest footprint from 2013 -
mid 2014 to include reporting, liaison with construction & actual coax
designs. ·
Complete
V8i certification for TWC although I was already very experienced with the
V8i release. ·
Completed
SCTE BPI course. EN-Incorporated, Austin TX Sept. 2012 – June 2013 Mechanical Drafter/Designer ·
Draft/Design
HVAC duct equipment routing within units and clubhouses using AutoCAD &
Revit. ·
Use
precise calculations to determine equipment sizes. ·
Enter
data into Manual J software to accurately size air handler and condensing
units. ·
Use
Comcheck and Rescheck software to accurately produce Energy Calculations for
buildings. Advanced.1, Georgetown TX Oct. 2009 – Oct. 2011 Project Coordinator ·
Recorded
team member’s production and error reports. ·
Trained
co-workers in multiple projects both in 8.05 & V8i. ·
Fiber
optic Design- Such as Node Layouts, Node Resizing, Fiber Splicing and Cell
Tower Back Haul Projects. ·
Red-lined/QC'ed
both as-built and fiber work before it went to the client. ·
Drafted
out precise Fiber routes. ·
Personalized
function keys to optimize production using Microstation/BentleyComms 8.05 Advanced.1, Georgetown TX Feb. 2007 – Aug. 2009 CAD Drafter ·
Met
and exceeded production goals in a timely and efficient manner. ·
Prepared
clear, complete and accurate working plans and detail drawings from rough or
detailed sketches using Microstation/BentleyComms 8.05 ·
Be
knowledgeable in the assigned project specs and design according to those
specs per project. ·
Use
basic knowledge of standard drafting practices and make mathematical
calculations. Modern
Impressions, Austin TX Oct. 2006 – Feb. 2007 Assistant /
Labor ·
Acid-stained
concrete flooring. ·
Custom
scored, from simple tile to complex shapes and curves. ·
Patched,
leveled, and resurfaced. ·
Epoxy-sealed
coated concrete floors. H-E-B,
Austin, TX Jul. 2002 – Apr. 2006 Cash
control/ Customer Service Tenant ·
Maintained
a friendly and clean working environment. ·
Provided
great customer service. ·
Controlled
and documented cash flow between cashiers. ·
In
charge of counting out all cashier tills at the end of the day. |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|